info@zjnanyang.com.cn |
هوزو نانيانغ الكهربائية المحركات المحدودة

AC Induction vs Inverter BLDC Motors: How Washing Machine OEMs Should Compare Total System Cost

وقت النشر: الزيارات: 408

Adult motor quotes can look similar while protecting fundamentally different purchases. For one, maybe they add a motor and capacitor. For another it is just charging the possibility of an BLDC motor but assume the inverter plus software work + validation in “other” for their budget In order to compare washing machine motor cost, define the complete drive system and what requirement must it satisfy at minimum for the washer. Then distinguish unit-specific costs from development and tooling sunk costs.

Which is less expensive depends on the platform/volume and engineering assets already in place; wash functions also vary. You will be able to utilize both a conventional AC induction solution and an inverter BLDC solution each commercially realistic. There is no global universal ratio price in between themselves. They are neither reliably priced in ratio universally to each other

Make the two proposals answer the same requirement

In comparison to the washing machine proposals for induction motor vs. a BLDC, both suppliers should be given an identical washer capacity (say 5 kg or whatever), mechanical layout, wash and spin duties as well as same supply conditions and performance targets! Identify which functionalities are compulsory and which optional A low system price to accommodate the necessary program is not a viable alternative.

The AC option here refers to a classic, mains-fed induction drive of the single phase solution. The BLDC option utilizes a compatible electronic inverter. Induction motors also have a form of inverter control, which makes our wording important here. This is also where BLDC does not equal direct drive: the transmission architecture must be explicitly stated. BLDC does not automatically mean direct drive: you have to specify the actual transmission architecture

This type of product family is exemplified with Nanyang 39 AC induction motor products. The motor assembly (not a full washer drive package) you see in the image here. Being in pitch does not determine whether a capacitor, harness, mounting hardware or switching components are present. The presence in quotation does not imply inclusion of capacitor, harnesses, mounting hardwares or switching components

AC Induction vs Inverter BLDC Motors - How Washing Machine OEMs Should Compare Total System Cost

Identify each proposed configuration by part number or drawing revision. If a supplier provides another washer architecture, name it as a distinct design proposal. Those expenses are probably still worth considering, but only when itemizing the changes to the tub and transmission as well as electronics and production process. You may still want to compare its costs, but the modifications made to the tub transmission electronics and production process must be factored in.

Compare the delivered scope line by line

Ask each supplier to mark every item as included, excluded, supplied by the OEM, or not required. A blank cell should remain an open question. It should never silently become zero cost.

Cost item

Conventional AC induction proposal

Inverter BLDC proposal

Motor assembly

Exact winding, shaft, mounting and thermal protection

Exact motor, mounting, connectors and feedback provision

Electrical hardware

Specified capacitor and switching parts where required

Inverter, power supply sections, sensing and protection as specified

Mechanical transmission

Actual belt, pulley, clutch or gearbox arrangement

Actual arrangement; BLDC does not itself remove transmission parts

Control integration

Washer board interfaces and switching sequence

Command interface, parameter configuration and firmware responsibilities

Production verification

Agreed electrical and functional checks

Agreed electrical, parameter and functional checks

Service provision

Defined spare parts and diagnostic information

Defined motor, controller and configuration support

 

Do not double count the very same function. An integrated solution may be circuitry that already exists on the washer board within an existing microcontroller from a BLDC supplier. As such, striping that circuit out of the main board may also require redesign and validation. When projecting the cost of a large proposed assembly like this, we count it as one production design — not two disparate catalogue assemblies. Asset the budgetary cost of one yet to be constructed album art work, not the total amount of two disjunct catalog assets

Evaluate the BLDC motor range with its committed controller arrangement. The motor photo below describes the product family only. It also doesn’t display the inverter or state that electronics are priced along with everything else involved in the motor. Does not show inverter, does not confirms that electronics are included in motor price

Nanyang TL BLDC Washing Machine Motor Assemble1

Leverage the offering by suppliers of drivers and controls to clarify where responsibilities sit. Who the supplier of the controller is, who releases its settings, whether you own the washer-side interface and what to do in case a motor or board changes after it being authorized. Don’t wait until first assembly of prototype, resolve these questions comparing quotations.

Separate unit cost from development expenditure

Ongoing expense are paid per unit as production occurs. It might comprise bought drive elements, shipping prices, meeting time and the charge for manufacturing testing plus a evidence-based allowance for rework. Ensure to keep currency, order quantity; delivery terms & quotation validity same. Do not evaluate the price of a large annual volume directly on that tender compared with a small trial order.

These are one time design, firmware integration as per projects along with fixtures and tooling costs for samples/validation. All this is probably already sitting on a platform somewhere. Note what can really be reused, what needs adaptation and who is paying for those activities that are left. Document what can actually reutilize, what must be adapted and who pays for every single activity left

A practical planning calculation is:

Allocated drive cost per washer = recurring drive cost per unit + project-specific non-recurring cost divided by planned production quantity.

This is a model of procurement, not supplier quote. Both options use the same allocation period and quantity. If you are not sure of the launch quantity, calculate more than one volume case. At a low initial launch rate, a proposal with high development cost and lower recurring costs may have very different characteristics than multiplied out at full production.

As an example, OEMs with a proven induction platform may want to keep certain fixturing and control hardware. ANOTHER OEMS MAY ALREADY HAD IN PLACE A PROPER FAMILY OF BLDC CONTROLLERS COMBINATED WITHIN THE KIND OF SOFTWARE TEAM. The comparison is skewed by those starting positions Is not to say that all BLDC projects start development from scratch and AC partners require none!

Include the work needed to release the product

The approval of the samples is not only to show that motor rotates. Costs at the agreed starting, reversing, thermal noise protection and washer levels verification you are trained through caramba. If the architecture changes, check what existing results still hold true. Perception — An approved motor component does not automatically qualify an appliance for market acceptance.

Tasks for owner and deliverable where records get validated. A supplier can deliver motor data, but the OEM owns this washer program and full-machine testing. The motor-testing ability of Nanyang gives teams a point for conversation to negotiate test assistance; the quotation should mention exactly which tests, samples, reports and acceptance conditions are included.

In addition, production readiness requires some sort of cost line. Think of connector access, fastener steps, harness routings, parameter loading and functional check times. Round these out on a representative build, where applicable. If the new configuration takes longer to handle, program etc. than heavy components the reality may be that fewer loose components does not automatically mean a shorter assembly time.

Keep energy and service assumptions visible

The business case is made of different parts such as: Factory cost and customers electric bill. If energy use is relevant to the position of the product, compare measured complete-cycle consumption while controlling equally for relevance. A rating of motor efficiency from a single operating point is not sufficient to determine energy saving for the complete washer. Display each energy estimate from the degree cycles and tariff on a different line

The same care applies to service economy. Replace unit – Handle if the replacement part is a motor, controller or assembled with other parts. Verify the diagnostic tools, spare parts availability and needs for system configuration or support contract period. The fact that brushes are not used does not in itself create a lower total service cost when compared to an induction motor (which again has no commutation mechanisms, mechanical or otherwise with the washer configurations considered here).

Warranty and repair data should only be used when the population, duty, and configuration are close to identical. If good numbers are in short supply, document the uncertainty or at least create well-labled scenarios. An improperly guessed failure rate can drown a small differential in purchase price and lead to an inaccurately precise business case. A mistakenly precise business case can created if failure rates are guessed instead of accurately calculated in a small purchase-price difference

Questions from purchasing teams

Is the AC induction option always cheaper?

No. This may be well-behaved for a platform that already has controls in-place and simple duty (the total mostly depends upon component scope, tooling costs/integration work/volume). Mark complete proposals against a consistent specification. Therefore the price of a motor alone can not be used to determine which system results in lower overall cost in the finished washer. A motor-only price won be enough to determine which system is cheaper in the final washer

How should an OEM compare quotations with missing items?

Send one common scope sheet to both suppliers and ask for the missing information. Record excluded items with a separate cost source for its owner HeLeave unresolved figures visible instead of zero. A proposal that is incomplete can still be considered but should not receive the lowest total-cost offer rank until its scope has been reconciled.

Request a quotation for the complete decision

And so we end this useful washing machine motors cost review stage, expected to be traceable in its boundary scope and mutually aligned performance requirement with a collocated work-bearing development workload responsibility. When you call for system quotation from Nanyang Motor, send in the washer architecture, duty and supply range of application volume plan current control arrangement acceptance tests. When both have a technically feasible AC induction and inverter BLDC ask for the cost of delivering an acceptable washer as opposed to just added costs based on motor label.

منتجات ذات صلة

أخبرنا عن متطلبات طلبك

فريق نانيانغ يرحب بوصولك ، من خلال فهم احتياجاتك مسبقا ، سنعد الحلول المقابلة لتسهيل التنسيق في الموقع ومعالجة مخاوفك بسرعة. نتطلع للتواصل والتعاون معكم!

خدمة العملاء

تستخدم أنظمة نان يانغ على نطاق واسع في مجالات مختلفة في جميع أنحاء العالم ، مما يوفر لك القوة والدقة والكفاءة. فريق دعم المبيعات والهندسة لدينا مستعد للإجابة على أي أسئلة قد يكون لديك، بما في ذلك الاقتباسات ودعم التطبيقات وتكوين المنتج. يرجى تقديم متطلباتك من خلال نموذج الخدمة المخصص لدينا حتى نتمكن من الاستجابة لاحتياجاتك بسرعة أكبر.

 
الصفحة الرئيسية
واتساب
البريد الإلكتروني
جهات الاتصال
أيقونة الدردشة